Apr 21, 20231 minIndustrial WasteDIW jointly discussed on the utilization of Industrial Waste for Circular MaterialsOn April 21st, 2023 [1], the Director General of the Department of Industrial Work (DIW), participated in the 3rd meeting with the...
Apr 20, 20233 minEnergyERC prepares to buy "Renewable Electricity" phase 2 for another 3,668 MW As Office of the Energy Regulatory Commission of Thailand (hereinafter referred as “ERC Office”) has announced a list of 175 selected...
Apr 18, 20232 minIndustrial WasteDIW inspected the illegal dumping of industrial wasteOn April 12, 2023 [1], the Director General of the Department of Industrial Works (DIW) together with representatives from relevant...
Apr 5, 20232 minEnergyERC announces 175 approved Renewable Energy PP projects with a total capacity of 4,852.26 MW.According to the Office of the Energy Regulatory Commission of Thailand (ERC Office) expecting the first phase for power purchases at...