top of page

Search


Results of 22 Public Hearing for Nong Khaem Waste-to-Energy Project
C&G Environmental Protection (Thailand) has summarized the results of 22 public hearings, which attended by participation from over 1,192 residents living surrounding the Nong Khaem power plant project. Furthermore, the company prepares to open the "Waste Pit" which is one of the system's primary structures for public viewing in May 2026. C&G Environmental Protection (Thailand) Co., Ltd. conducted 22 small-group public hearing meetings between February 19 and March 1, 2026.
Mar 252 min read


Deputy Minister of Interior (MOI.2) visits Mae Sot City Municipality, Tak province to inspect MSW-to Energy power plant project
At 9:00 on July 12, 2024, Mr. Songsak Thongsri, 1st Deputy Minister of Interior (MOI.2), along with his team, traveled to Mae Sot City...
Jul 12, 20242 min read


TPCH repays THB 1.5 billion in bonds and signs PPA for 9.9 MW SPNK waste to energy power plant
TPC Power Holding PCL (TPCH) successfully has repaid its 2-year-and-9-month debentures, No. 2/2564 (2021) (TPCH246A) for a total of THB...
Jul 11, 20243 min read


Biomass Cogeneration Power Plant from Rice Husks
As part of efforts to promote resource efficiency, Ajinomoto Group have developed processes to utilize of by-products and materials from...
Jun 30, 20241 min read
bottom of page
