top of page
Kanokwan

ERC accepts the purchase of 10 MW of solar rooftop power

Updated: Aug 30, 2022



ERC announces to purchase solar rooftops power from Schools, hospitals, educational institutions, and pumping water for agriculture in 2022. The total purchase volume is 10 MW, divided into 5 MW by MEA and 5 MW by PEA.



ERC will accept proposal by September 30, 2022 and will announce the list of candidates within 45 days after the date of sale offer received.



ERC regulated that Power purchase price is THB1.00 per unit, the installed capacity must be more than 10 kilowatts but less than 200 kilowatts, power purchase period is not more than 10 years and the date of power distribution into the commercial system is set within 270 days from the date of the power purchase agreement. ERC will serve on first come first serve basis.



Comments

Couldn’t Load Comments
It looks like there was a technical problem. Try reconnecting or refreshing the page.
bottom of page